Aker Solutions Awarded FEED Contract for Electrification of Equinor’s Troll B and C Platforms
January 15, 2020 - Aker Solutions has secured a front-end engineering (FEED) study from Equinor to enable power from shore for the Troll B and C platforms, to reduce CO2 emissions from the field.The contract includes an option for the engineering, procurement, construction and installation (EPCI) work following the completion of the study. The study will outline how installation of electrical equipment on Troll B and C, as well as replacement from gas turbine to electrical driven compressors on Troll C can be performed. This will enable Equinor’s goal of supplying Troll B and C with