A good and safe production year 2015 at Fortum’s Loviisa nuclear power plant – sizeable investment programme progressed as planned
FORTUM CORPORATION PRESS RELEASE 4 January 2016Fortum’s Loviisa nuclear power plant had a successful production year in 2015.A total of 8.47 terawatt hours of power was generated, corresponding to about13 per cent of total energy generation in Finland. On an international scale,the 92.9% load factor of the Loviisa nuclear power plant was among the best inthe world for pressurised water reactor power plants. Loviisa unit 1’s loadfactor was 92.7% and Loviisa unit 2’s 93.1%. Loviisa 1’s production output wasthe fourth highest in the history of the plant.Both units underwent a