Veidekke ASA: Wind farm construction in Västra Götaland
Veidekke has been commissioned by RES Renewable Norden to construct 13 wind turbine foundations with associated roads in Rödene outside Alingsås in Västra Götaland in Sweden. The project is a turnkey contract valued at approximately SEK 115 million, excluding VAT.The wind farm at Rödene will have a total output of 86 MW, which corresponds to the energy consumption of 40,000 Swedish homes. The renewable energy produced will compensate for emissions corresponding to 230,000 tonnes of carbon dioxide per year. “We look forward to a productive collaboration with Veidekke in the Rödene project.