Aker Solutions Wins Topside Modification Contract for Hasselmus Development
July 2, 2021 - Aker Solutions has won a sizable[1] contract from OKEA for modifications on the Draugen platform to enable processing of gas from the Hasselmus discovery.The contract includes engineering, procurement, construction, installation and commissioning (EPCIC) of new equipment. The scope covers hook-up of new riser, a new inlet arrangement with electrical heater, new inlet scrubber, valve arrangement, revamp of gas export compressors and modifications of the condensate train. "We look forward to working with OKEA in this project. Aker Solutions has a strong and dedicated team