BlueNord: Preliminary Production for August 2024
Oslo, 6 September 2024: BlueNord ASA ("BlueNord" or the "Company") has today announced its preliminary production figures for August 2024. The Company had a preliminary production in August of net 27.0 mboepd of which 1.5 mboepd is from the Harald field which has had a stable production through the new Tyra facilities. The production during the month from the Dan, Gorm and Halfdan hubs continues to be strong with a preliminary high average uptime of 94% and with a positive response from the Skiold gas acceleration project on the Gorm hub. This information is subject to disclosure