SEK 35 million for increased production in Orrefors
At its small-diameter timber sawmill in Orrefors, Södra is investing about SEK 35 million in a new boiler and drying facility, which will enable production increases in the future. The supplier is Fröseke Industriservice AB.“This investment is necessary for profitability. Currently, there is insufficient boiler capacity, which means we must sell some goods undried. The investment will enable us to increase production and also dry the entire sawn volume,” said Jörgen Lindquist, President of the Södra Wood business area.The limiting factors for the sawmill’s capacity are the boilers and