Metso awarded detailed engineering contract by Rio Tinto for BioIron[TM] process
Metso Corporation’s press release on August 8, 2023, at 09:00 a.m. EESTRio Tinto has awarded Metso a detailed design and engineering contract for their continuous pilot plant (CPP) for the BioIron[TM] process. The contract is an extension of the work that Rio Tinto and Metso have been doing together on the development of the BioIron[TM ] process, the effectiveness of which was successfully proven through small-scale pilot tests conducted at Metso’s