Dome Energy gives drilling update on Glaze 11-10 in the Illinois Basin
Dome Energy AB. (herein after “Dome” and/or “the Company”) announces a successful drilling of the Glaze 11-10 well in the Illinois Basin. After reaching target depth, the logging operations commenced immediately. Both resistivity and porosity logs indicate that the Company is locating all pay-zones it was aiming for. Dome moved on to complete the well by casing the hole drilled. As soon as cementing has dried up, Dome will perforate and fracture stimulate several zones. Initial flow rates can take up to 30 days to see peak production. Dome will continue to