Bäckhammar mill ready for start-up next week
Nordic Paper Bäckhammar mill is ready for start-up. The prognosis and working hypothesis are that the pulp production will start in the beginning of next week. As always, there will be a ramp up phase of the pulp production.The paper production will follow the pulp production. Because of the difficult situation it will take time before the production is running with full capacity and it may take time before we are in phase with our planned deliveries. The Bäckhammar mill has been standing still due to a damaged floor drain that caused big problems. A mixture of water and soap leaked out