Gasum study shows that Finnish power system can take up to 30 TWh of wind power
Commissioned by the Finnish Wind Power Association, Gasum studied how much weather-dependent variable wind power the Finnish power system could take in 2030. The study showed that the Finnish power system could take as much as 25-30 terawatt hours (TWh). The study findings support the Finnish Wind Power Association’s aim of wind power meeting 30% of Finland’s electricity consumption at the turn of the next decade. Gasum is a major actor in the wind power segment and strives to increase the procurement renewable wind power in the Nordic countries.Commissioned by the Finnish Wind Power