SOTKAMO SILVER AB: THE RAMP-UP PHASE OF SILVER MINE HAS BEEN COMPLETED, THE AUGUST EBITDA WAS POSITIVE.
Press release: Stockholm, September 24, 2019, 8,45 amThe ramp-up period of the Silver Mine was completed in August. The production capacity is in line with the long-term production target for both the mining and concentrating plant. At the end of the start-up period, metal recoveries into commercial concentrates were: Ag 86%; Au 86%, Zn 81%; Pb 83%.The monthly EBITDA of the subsidiary Sotkamo Silver Oy in August was positive.During July, the Silver Mine produced about 93,400 Oz of silver, 260 Oz of gold, 88 tonnes of lead and 230 tonnes of zinc in concentrates, totalling about 168,000