Vestas wins 54 MW order in Australia
The firm and unconditional order for 15 V126-3.45 MW was placed by long-term customer Tilt Renewables for the Salt Creek wind park in Woorndoo, Victoria. The turbines will be delivered in Power Optimised Mode of 3.6 MW to maximise energy output. The order includes a 25-year Active Output Management 4000 (AOM4000) service agreement in which Vestas guarantees a defined high level of availability and performance for the project’s entire lifetime. It also includes the SCADA VestasOnline® Business system for data-driven monitoring and preventive maintenance. “We value the long standing