Skanska builds new Sixth Street Viaduct in Los Angeles, USA, for USD 134 M, about SEK 1.2 billion
Skanska has, in a joint venture with Stacy and Witbeck, signed a contract with the City of Los Angeles to construct the new Sixth Street Viaduct in Los Angeles, USA. The total contract is worth USD 191M. Skanska USA Civil will include its share of the contract worth USD 134M, about SEK 1.2 billion, in the order bookings for the first quarter 2017.The new structure will be a Los Angeles landmark. The design of the bridge, known as “The Ribbon of Light,” was created by Los Angeles-based architect Michael Maltzan. The original bridge, built in 1932, spanned about 1,000 meters across the river