Interim Report January – June 2018
Significant events during the second quarter 2018 · Golder was contracted for the finalisation of the feasibility study for Blötberget. · The studies regarding mine design and production planning was reported · The formerly long-term loan was replaced in equal amounts by a directed issue of shares and a convertible loan with a two year maturity. · A rights issue amounting to MSEK 36.5 was decided upon and started. Second quarter, 1 April – 30 June 2018 · Income amounted to SEK 0 million (0) · Earnings after tax amounted to SEK –2.6 million (–2.6) · Investments in