Operational update
22 December 2022 IOG plc Operational update: Blythe H2 well plan and Southwark progress IOG plc ("IOG", or "the Company"), (AIM: IOG.L), the Net Zero UK gas and infrastructure operator focused on high return projects, provides an update on current production, plans for a second Blythe production well ("H2") and progress at Southwark. Highlights: · Saturn Banks 2H22 average production expected to be c.22 mmscf/d · Southwark A2 well test and clean-up planned for next week with first gas expected by mid-January · Blythe H2 well planned to be drilled directly after