Vestas’ EPC and repowering expertise secures turnkey solution that will triple wind park capacity
Vestas has received a firm and unconditional 21 MW order from Energieprojekte Eichsfeld for repowering of the Reinholterode wind farm in Central Germany. With this project, Vestas gets a new customer and the opportunity to repower wind turbines from a competitor. The wind park currently consists of four 1.5 MW turbines, which will be replaced by six V126-3.45 MW that triples the installed capacity, while increasing annual energy production even more due to more efficient turbines. To ensure the most economic and sustainable solution for the Reinholterode project, Vestas provides a