Azelio conducts final testing for unique pump system developed with Swiss company Egger
Azelio has developed a unique pump system for the transfer of heat in its energy storage system with the help of the Swiss company Emile Egger & Cie SA (Egger). A life-length test is now underway to verify the performance and workings of the pump system.Azelio continues its progression towards the large-scale commercialisation of its Stirling engine based power storage solution, which produces cost-effective sustainable electricity on demand around the clock. The system’s unique long-term energy storage capacity – allowing for the production of electricity for 13 hours at nominal power –