Sweco improves the long-term electricity supply through reinforcement of the national grid in Sweden
To increase the transmission capacity between northern and southern Sweden, Svenska kraftnät will reinforce the electricity grid in central Sweden. Sweco has been commissioned to design two parallel 400 kV overhead power lines to be built along a 100-kilometre-long section.
Wind power expansion in the north, nuclear decommissioning in the south and increased electricity consumption in Sweden require increased transmission capacity in the electricity grid throughout Sweden. Sweco’s experts within areas such as power lines, geotechnics, hydrogeology, surveying and mapping are