Peab builds school in Löddeköpinge
Peab has been commissioned to build a school for pre-school and grades 1-9 in Löddeköpinge, Kävlinge Municipality. The customer is KKL Fastigheter AB and the contract is worth SEK 290 million.The project is divided into two stages where the first stage was contracted in the fall of 2019 and entailed designing, planning and calculation. A new contract has now been signed for the second stage which is the production phase. The school will be located in the northeastern part of Löddeköpinge and will consist of four buildings linked by passageways. There will be three school buildings for