Ode to steel arc – installation begins
YIT Corporation Press release January 30, 2017, at 09:00 a.m.Helsinki Central Library is made up of a combination of a unique steel-framed bridge and building. The massive arcs will be transported to the centre of Helsinki in parts at night time. The construction has lasted for a year and a half, and Helsinki Central Library Oodi (Ode) is now beginning to take shape. Next week, YIT will start assembling the building’s two longitudinal steel arcs that have a length of about 100 metres. The aim is to complete the arc installation work by the end of March. The steel arc parts will be