Peab builds new bridge over Tärendo River
Peab has been commissioned to build a new bridge over Tärendo River in Norrbotten. The customer is the Swedish Transport Administration and the contract is worth SEK 111 million.The new bridge over Tärendo River will be 152 meters long and constructed out of both steel and concrete with support anchored in the river. It will be eight meters wide and have a higher carrying capacity than the existing bridge. This means that the current traffic light will be removed and it will become possible for all kinds of vehicles to pass each other. The project also includes building new connecting roads